Various methods for connecting an offshore charging device to the infrastructure of an offshore wind farm can be envisioned:
- 1A Charging a vessel (of all size, shapes and functions) directly from a wind turbine
- 1B Charging a vessel (of all size, shapes and functions) from a charging buoy, connected directly to a wind turbine. This is the option being trialled in collaboration with Maersk Supply Service
- 2A Charging a vessel (of all size, shapes and functions) directly from an offshore substation
- 2B Charging a vessel (of all size, shapes and functions) from a charging buoy, connected directly to an offshore substation
- 3A Charging a vessel (of all size, shapes and functions) directly from a separate transformer connected to the wind turbine, located either on the wind turbine or on a separate foundation
- 4A Charging a vessel (of all size, shapes and functions) directly from a separate transformer connected to the substation, located either on the sub station or on a separate foundation